South / Southeast Area Map
South / Southeast Area Oblique Photo - July 2014
South / Southeast Area Oblique Photo - June 2015
South / Southeast Area Oblique Photo - June 2015
South / Southeast Area Oblique Photo - June 2015
South / Southeast Area Oblique Photo - September 2015
South / Southeast Area Oblique Photo - October 2015
South / Southeast Area Oblique Photo - November 2015
South / Southeast Area Oblique Photo - December 2015
South / Southeast Area Oblique Photo - April 2016
Air Monitoring Station / Looking East (March 4, 2014)
Grubbing and Clearing on Southeastern Side / Looking East (March 6, 2014)
Clearing and Grubbing / Looking South (March 11, 2014)
A&S Railroad 3rd Rail Project, Gypsum Wall Cut / Looking South (March 11, 2014)
A&S Railroad 3rd Rail Project, Overburden Cut / Looking Southwest (March 18, 2014)
Air Monitoring Station / Looking West / Southwest (March 19, 2014)
Water Truck for Dust Control / Looking North / Northeast (March 25, 2014)
A&S Railroad 3rd Rail Project, Cutting Base Material to Make Room for Clean Soil / Looking North (March 25, 2014)
OU1 Security Fence and Solid Waste Issues / Looking Northeast (April 1, 2014)
A&S Railroad 3rd Rail Project, Overburden Cut Area / Looking West / Northwest (March 17, 2014)
A&S Railroad 3rd Rail Project, Application of Aggregate and Geotextile Fabric over Clean Soil / Looking Southeast (April 16, 2014)
USEPA/IEPA Site Inspection, South-Southeastern Area / Looking West (April 17, 2014)
A&S Railroad 3rd Rail Project, Aggregate Surfacing / Looking South (April 22, 2014)
Gypsum Cut South Pond Area, Gypsum Transport Area / Looking Northeast (April 25, 2014)
Gypsum Cut South Pond Area, Gypsum Transport Area / Looking West (April 25, 2014)
Gypsum Wall Rebuilding at the Southeast Site Boundary / Looking West / Southwest (April 29, 2014)
Southeastern Site Area, Gypsum Resizing Activities / Looking West (April 30, 2014)
A&S Railroad 3rd Rail Project Area / Looking South (May 2, 2014)
A&S Railroad 3rd Rail Project Area / Looking South (May 6, 2014)
Southeastern Site Area / Looking Southwest (May 8, 2014)
Southeastern Site Area  Ongoing Gypsum Cutting / Looking West (May 12, 2014)
Water Truck for Dust Control / Looking East/ Southeast (May 12, 2014)
A&S Railroad 3rd Rail Project Activities / Looking North (May 12, 2014)
A&S Railroad 3rd Rail Project Activities / Looking North (May 12, 2014)
A&S Railroad Gabion Wall Construction Activities / Looking Southwest (May 29, 2014)
A&S Railroad Gabion Wall Construction Activities / Looking North (May 29, 2014)
A&S Railroad Gabion Wall Construction Activities / Looking South/ Southeast (May 29, 2014)
A&S Railroad 3rd Rail Project, Gabion Wall Construction / Looking Northwest (June 6, 2014)
Southeastern Site Area  Former SPL Area, Cover Soil Placement / Looking North (June 17, 2014)
Southeast Site Area  Dust Suppression / Looking East/Northeast  (June 19, 2014)
Southeast Site Area Gypsum Cutting and Re-Grading / Looking South  (June 20, 2014)
A&S Railroad 3rd Rail Installation Activities, Eastern OU1 Boundary / Looking East/ Southeast (June 27, 2014)
A&S Railroad Gabion Wall/3rd Rail Project, Pre-Final Inspection / Looking South / Southeast (July 1, 2014)
Gypsum Cutting Above A&S Railroad Gabion Wall / Looking South (July 8, 2014)
Dust Control Between Eastern and Southern RDAs / Looking West (July 15, 2014)
Southeast Corner of Site / Looking South / Southeast (July 18, 2014)
Trucking Imported Clean Fill Cover Materials, Southeast Corner of Site / Looking South / Southeast (July 10, 2014)
Trucking Imported Clean Fill Cover Materials, Southeast Corner of Site / Looking South / Southeast (July 10, 2014)
Gypsum Cutting and Re-Grading Above A&S Railroad Gabion Wall / Looking West / Northwest (July 11, 2014)
Trucking Imported Clean Fill Cover Materials, Southeast Corner of Southern RDA / Looking South / Southwest (July 18, 2014)
Trucking Imported Clean Fill Cover Materials, Southeast Corner of Southern RDA / Looking West / Southwest (July 18, 2014)Â
Trucking Imported Clean Fill Cover Materials, Slope of Southeast Corner of Site / Looking South (July 31, 2014)
Security Fence, Southeast Corner of Site / Looking West / Southwest (July 31, 2014)
Air Monitoring Station, Southeast Corner of the Site / Looking South / Southeast (August 14, 2014)
Seeding Activities, Southern Corner of the Site / Looking Northwest (August 14, 2014)
Seeding Activities, Southern Corner of the Site / Looking South / Southeast (August 14, 2014)
Clean Soil Cover Application, A&S Railroad Gabion Wall Near Eastern RDA / Looking North (August 15, 2014)
Straw Cover for Seeding, Southeastern Corner of the Site / Looking South / Southeast (August 15, 2014)
Straw Cover for Seeding, Southeastern Corner of the Site / Looking North (August 15, 2014)
Straw Cover for New Grass Seeding Area / Looking North / Northeast (August 18, 2014)
Clean Soil Cover Application, A&S Railroad Gabion Wall Near Eastern RDA / Looking South (August 26, 2014)
Clean Soil Cover Application, Just East of Eastern RDA / Looking West / Northwest (September 9, 2014)
A&S Railroad Gabion Wall, Warning Signs / Looking West / Southwest (September 15, 2014)
Proposed Security Fence Alignment South of A&S Railroad Gabion Wall / Looking North (September 16, 2014)
Clean Soil Cover Grading Above A&S Railroad Gabion Wall / Looking Northwest (August 26, 2014)
Slopes Above A&S Railroad A&S Railroad Gabion Wall / Looking West (September 2, 2014)
A&S Railroad Gabion Basket Structure for 100-Year Flood Emergency Overflow / Looking West (September 16, 2014)
A&S Railroad Gabion Basket Structure for 100-Yr Flood Emergency Overflow / Looking Southwest (September 16, 2014)
A&S Railroad Gabion Wall, Southern End / Looking South (September 16, 2014)
A&S Railroad Gabion Basket Structure Stone for 100-Yr Flood Emergency Overflow / Looking East (September 16, 2014)
A&S Railroad Gabion Basket Structure, Stone for 100-Yr Flood Emergency Overflow / Looking East (September 16, 2014)
A&S Railroad Gabion Basket Structure Stone for 100-Yr Flood Emergency Overflow / Looking East (September 17, 2014)
A&S Railroad Gabion Basket Structure Stone for 100-Yr Flood Emergency Overflow / Looking West (September 17, 2014)
A&S Railroad Gabion Basket Structure Stone for 100-Yr Flood Emergency Overflow / Looking Northeast (September 17, 2014)
Gabion Basket Structure South of A&S Railroad Gabion Wall / Looking East / Southeast (September 19, 2014)
Security Fence Installation, Southeast Corner of Site / Looking West / Southwest (September 19, 2014)
Security Fence Installation, Southeast Corner of Site / Looking North / Northeast (September 19, 2014)
100-Yr Flood Emergency Water Conveyance Structure, Eastern RDA / Looking West (September 23, 2014)
A&S Railroad Gabion Wall Area, Clean Soil Cover Dress Up Work / Looking North / Northwest (September 23, 2014)
Security Fence, Eastern OU1 Boundary / Looking Northeast (September 23, 2014)
Security Fence Installation, Southeast Corner of Site / Looking North / Northeast (September 19, 2014)
Security Fence Installation, Southeast Corner of Site / Looking South (September 19, 2014)Â
100-Yr Flood Emergency Water Conveyance Structure, Eastern RDA / Looking West (September 23, 2014)
Clean Soil Cover Progress, A&S Railroad Gabion Wall North End / Looking Northeast (September 24, 2014)
Security Fence Installation Activities, Eastern OU1 Boundary / Looking South / Southeast (September 26, 2014)
Security Fence Installation Activities, Eastern OU1 Boundary / Looking North / Northwest (September 26, 2014)
Security Fence Installation Activities, Eastern OU1 Boundary / Looking South (September 26, 2014)
Erosion Repair, Southeastern OU1 Boundary / Looking Northeast (September 29, 2014)
Security Fence Installation, Southeastern OU1 Boundary / Looking Northwest (September 29, 2014)
Security Fence Installation, Southeastern OU1 Boundary / Looking West / Southwest (September 29, 2014)
Security Fence Installation, Southeastern OU1 Boundary / Looking South / Southeast (September 29, 2014)
Site Tour to Observe A&S Railroad Gabion Wall Area / Looking West (September 30, 2014)
Site Tour to Observe A&S Railroad Gabion Wall Area / Looking Northeast (September 30, 2014)
Security Fence, Southeast Corner of Site / Looking Northeast (October 2, 2014)
South End of A&S Railroad Gabion Wall / Looking North (October 7, 2014)
Eastern OU1 Boundary Seen From Missouri Avenue Overpass / Looking North / Northeast (October 17, 2014)
Off-site Repair Activities Along Pocket Road / Looking East / Northeast (September 30, 2014)
Pocket Road Closure for Repair Work / Looking Southeast (October 2, 2014)
Slopes of Southern RDA and Pond / Looking East (October 24, 2014)
Gabion Basket 100-yr Flood Overflow Structure, South of A&S Railroad Gabion Wall / Looking North (October 24, 2014)
Security Fence Installation, Eastern OU1 Boundary / Looking South (October 24, 2014)
Security Fence Installation, Eastern OU1 Boundary / Looking North (October 24, 2014)
Security Fence Installation, Eastern OU1 Boundary / Looking South (October 24, 2014) Â
Security Fencing Along A&S Railroad Gabion Wall / Looking North (October 28, 2014)
Recent Security Fence Installation Along Eastern OU-1 Boundary / Looking North / Northeast (October 29, 2014)
Recent Security Fence Installation Along Eastern OU-1 Boundary / Looking North / Northeast (October 29, 2014)
Erosion Control Matting Installed Over New Seed Above Gabion Wall / Looking South (October 30, 2014)
Erosion Control Matting Installed Over New Seed Above A&S Railroad Gabion Wall / Looking North (October 30, 2014)
OU-1 Perimeter Fence and Slope Above A&S Railroad Gabion Wall / Looking North / Northeast (November 6, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #3 / Looking North / Northwest (December 11, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #3 / Looking Northwest (December 11, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #3 / Looking Southeast (December 11, 2014)
New Signage, Eastern OU-1 Boundary / Looking West (December 8, 2014)
Inspection Participants In Route to Area 1B Test Hole #3 / Looking North (December 11, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection / Area 1B Test Hole #3 Â (December 11, 2014)
Area 1B Slopes Near A&S Railroad Gabion Wall / Looking Southeast (April 17, 2015)
Area 3B (Left), Area 1B (Right) Taken From A&S Railroad Gabion Wall Slope / Looking South (April 17, 2015)
Area 3B, From Near A&S Railroad Gabion Wall Slope / Looking East / Southeast (April 17, 2015)
Area 1B Slopes Near A&S Railroad Gabion Wall / Looking Southeast (April 17, 2015)
Area 3B Cover Soil Reworking Activities Following Winter Work Suspension / Looking East / Southeast (April 21, 2015)
Area 3B Cover Soil Reworking Activities Following Winter Work Suspension / Looking East / Southeast (April 21, 2015)
Area 1B Slopes Near A&S Railroad Gabion Wall / Looking North / Northeast (April 21, 2015)
Area 3B Cover Soil Reworking Activities Following Winter Work Suspension / Looking South (April 21, 2015)
Piezometer Installation, A&S Railroad Gabion Wall Drainage Ditch / Looking South (April 30, 2015)
Piezometer Installation, A&S Railroad Gabion Wall Drainage Ditch / Looking South (April 30, 2015)
Piezometer Installation, A&S Railroad Gabion Wall Drainage Ditch / Looking North (April 30, 2015)
Area 1B, Area 1B Pond / Looking Southwest (May 5, 2015)
Piezometer Installation, A&S Railroad Gabion Wall Drainage Ditch / Looking South (April 30, 2015)
A&S Railroad Gabion Wall Drainage Ditch, South End / Looking South (April 30, 2015)
Water Truck for Dust Control in Area 1B / Looking South / Southwest (May 5, 2015)
Straw and Seeding Activities, Southeast Corner of Area 3B / Looking North / Northeast (May 6, 2015)
Straw and Seeding Activities, Southeast Corner of Area 3B / Looking South (May 6, 2015)
Straw and Seeding Activities, Southeast Corner of Area 3B / Looking South (May 6, 2015)
Straw and Seeding Activities, Southeast Corner of Area 3B / Looking South (May 6, 2015)
Cover Soil Grass Emergence in Area 3B, Taken from Slope of Area 1B Slope / Looking North / Northeast (May 21, 2015)
Cover Soil Grass Emergence in Area 1B / Looking West (May 21, 2015)
Cover Soil Grass Emergence in Area 3B / Looking South (May 21, 2015)
Cover Soil Grass Emergence in Area 3B / Looking South / Southeast (May 21, 2015)
Cover Soil Grass Emergence in Area 3B / Looking South (May 21, 2015)
Eastern OU-1 Boundary Drainage Ditch / Looking North (June 24, 2015)
Conditions Along A&S Railroad Gabion Wall, Eastern OU-1 Boundary / Looking South / Southwest (July 10, 2015)
Grass Emergence on Area 1B Slope, South of A&S Railroad Gabion Wall / Looking North (May 21, 2015)
Storm Water Culvert, South End of A&S Railroad Gabion Wall / Looking North (May 28, 2015)
Clean Cover and Soil Backfill Activities in Area 1C / Looking South / Southwest (June 12, 2015)
Clean Cover and Soil Backfill Activities in Area 1C / Looking West / Southwest (June 12, 2015)
Conditions Along A&S Railroad Gabion Wall, Eastern OU-1 Boundary / Looking South / Southwest (July 10, 2015)
Application of Clean Cover Soil in Area 1C / Looking East / Northeast (July 14, 2015)
Current Conditions in Area 1C / Looking West / Southwest (July 21, 2015)
Trenching Prior to Installation of Drainage Pipe Near the A&S Railroad Gabion Wall / Looking North (July 31, 2015)
Installation of A&S Railroad Gabion Wall Drainage Pipe Along Eastern OU-1 Boundary / Looking North (July 31, 2015)
Installation of A&S Railroad Gabion Wall Drainage Pipe Along Eastern OU-1 Boundary / Looking South (July 31, 2015)
Installation of A&S Railroad Gabion Wall Drainage Pipe Along Eastern OU-1 Boundary / Looking East (July 31, 2015)
A&S Railroad Gabion Wall Drainage Pipe Staged Along Eastern OU-1 Boundary / Looking South (July 31, 2015)
Installation of A&S Railroad Gabion Wall Drainage Pipe Along Eastern OU-1 Boundary / Looking South (July 31, 2015)
Installation of A&S Railroad Gabion Wall Drainage Pipe Along Eastern OU-1 Boundary / Looking South (July 31, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Activities / Looking South (August 7, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress / Looking South (August 17, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress / Looking South (August 18, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation, Manhole Tee Installation / Looking South (August 7, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation, Manhole Tee Installation / Looking South (August 7, 2015)
Eastern OU-1 Boundary Culvert, Sealed Pending Installation of A&S Railroad Drainage Pipe / Looking North (August 17, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress / Looking South (August 18, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress / Looking South (August 18, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress / Looking South (August 18, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress / Looking South (August 18, 2015)
A&S Railroad Gabion Wall Drainage Pipe Installation Progress, Water Evaluation / Looking North (August 18, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation Progress, Final Activities / Looking North (August 25, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation Progress, Final Activities / Looking North (August 25, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation Progress, Final Activities / Looking West (August 25, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation, Eastern OU-1 Boundary, Final Activities / Looking West (August 25, 2015)
A&S Railroad Gabion Wall Drainage Ditch Pipe Installation, Eastern OU-1 Boundary, Final Activities / Looking South (August 25, 2015)
A&S Railroad Gabion Wall, Current Conditions / Looking East / Northeast (September 16, 2015)
Status of A&S Railroad Gabion Wall Drainage Ditch Pipe Installation Activities / Looking North (August 26, 2015)
Status of A&S Railroad Gabion Wall Drainage Ditch Pipe Installation Activities / Looking South / Southwest (August 26, 2015)
A&S Gabion Wall Ditch, Capped Culvert, Southern Discharge Point / Looking North (September 10, 2015)
A&S Railroad Gabion Wall, Current Conditions / Looking North (September 16, 2015)
A&S Railroad Gabion Wall Ditch, Current Conditions / Looking North (September 22, 2015)
A&S Railroad Gabion Wall Ditch, Current Conditions / Looking North (September 22, 2015)
A&S Railroad Gabion Wall Ditch, Current Conditions / Looking South (September 22, 2015)
A&S Railroad Gabion Wall Ditch, Current Conditions / Looking North (September 22, 2015)
A&S Railroad Gabion Wall Ditch, Current Conditions / Looking South (September 22, 2015)
Area 3B Near Eastern OU-1 Boundary / Looking East (September 29, 2015)
Area 3B Near Eastern OU-1 Boundary / Looking East (September 29, 2015)
Area 3B Near Eastern OU-1 Boundary / Looking South / Southeast (September 29, 2015)
Former Ballfields Area From Louisiana Blvd, Northeast Corner / West (September 30, 2015)
A&S Railroad Gabion Wall Drainage Pipe / Looking North (October 7, 2015)
A&S Railroad Gabion Wall Drainage Pipe, T4 Location / (October 16, 2015)
A&S Railroad Gabion Wall Drainage Pipe, T4 Location / (October 16, 2015)
Void Space in A&S Railroad Drainage Ditch / Looking North / Northeast (October 16, 2015)
Stormwater Diversion Dike Placed in Southeast Corner of Area 3B / Looking North (October 26, 2015)
A&S Railroad Gabion Wall Drainage Ditch / Looking South (October 27, 2015)
A&S Railroad Gabion Wall Drainage Pipe, T2 Location / (October 16, 2015)
A&S Railroad Gabion Wall Drainage Pipe, T1 Location / (October 16, 2015)
A&S Railroad Gabion Wall Mid-Point / Looking South / Southwest (October 16, 2015)
A&S Railroad Gabion Wall Drainage Ditch / Looking South (October 27, 2015)
A&S Railroad Gabion Wall Drainage Ditch / Looking North (October 28, 2015)
A&S Railroad Gabion Wall Drainage Ditch Regrading / Looking South (October 29, 2015)
A&S Railroad Gabion Wall Drainage Ditch Regrading / Looking South (October 29, 2015)
A&S Railroad Gabion Wall Drainage Ditch Regrading / Looking North (October 29, 2015)
A&S Railroad Gabion Wall Drainage Ditch Regrading / Looking North (October 29, 2015)