Southwest Area Map
Southwest Area Oblique Photo - July 2014
Southwest Area Oblique Photo - June 2015
Southwest Area Oblique Photo - December 2015
Southwest Area Oblique Photo - April 2016
Clearing, Fueling the Mulching Machine / Looking West (March 11, 2014)
Site Clearing, Grubbing and Mulching / Looking West (March 17, 2014)
Site Clearing, Southwest Area of the Site / Looking West (March 17, 2014)
Southwest Area of the Site, Gypsum Wall and Piezometer / Looking East (March 19, 2014)
Site Clearing, Grubbing and Mulching in Southern RDA / Looking West (March 19, 2014)
Site Clearing, Grubbing and Mulching in Southern RDA / Looking Northeast (March 19, 2014)
Erosion Control Installation, Silt Fencing Along Southwestern Site Boundary / Looking East (March 19, 2014)
Erosion Control, Silt Fencing Along Site Entrance Road / Looking North (March 25, 2014)
Site Clearing on Southern RDA, Mulching and Grubbing to 1-3” of Wood Chips / Looking North (April 1, 2014)
Erosion Control, Silt Fence Installation Around South RDA Storm Water Pond / Looking South (April 1, 2014)
Equipment Staging Area, Southwestern Site Area / Looking Northeast (April 1, 2014)
Security Fence Line Location, Southwestern Area / Looking East (April 1, 2014)
Proposed Security Fence Line Location, Property Line and Solid Waste Issues, Southwestern Area / Looking West (April 1, 2014)
Gypsum Wall Buttress Construction in Southwestern Area of the Site / Looking West (April 17, 2014)
Gypsum Wall Buttress Construction in Southwestern Area of the Site / Looking Northeast (April 17, 2014)
Gypsum Wall Buttress Construction in Southwestern Area of the Site / Looking West (April 17, 2014)
Gypsum Slope Rebuilding and Grading, Southwestern Area of the Site / Looking Southeast (April 22, 2014)
Gypsum Removal, Southeastern Area of the Site / Looking East / Southeast (April 22, 2014)
Gypsum Slope Rebuilding and Grading Along Southwestern Site Area / Looking West (April 22, 2014)
Gypsum Slope Rebuilding and Grading Along Southwestern Site Area / Looking Northwest (April 22, 2014)
Gypsum Slope Rebuilding and Grading Along Southwestern Site Area / Looking North (April 22, 2014)
Gypsum Slope Rebuilding and Grading Along Southwestern Site Area / Looking West (April 25, 2014)
Concrete Removal in Southwestern Site Area / Looking Southwest (April 30, 2014)
Gypsum Wall Buttress Building and Re-Grading / Looking Northeast (April 30, 2014)
Gypsum Removal and Grading Near Gypsum Wall / Looking South / Southwest (April 30, 2014)
Concrete Removal in Southwestern Site Area / Looking West (April 30, 2014)
Gypsum Wall Buttress Building and Re-Grading / Looking West (April 30, 2014)
Proposed Security Fence Location with Solid Waste Present, Southwestern Area of the Site / Looking West (April 17, 2014)
Gypsum Slope Rebuilding and Grading, Southwestern Area of the Site / Looking East / Southeast (April 22, 2014)
Former Vertical Gypsum Wall After Sloping Activities / Looking West (May 16, 2014)
Security Fence Construction, Southwestern Boundary / Looking West (May 16, 2014)
Site Clearing, Southern OU-1 Boundary / Looking West (July 7, 2014)
Security Fence Location, Southern OU-1 Boundary East of Entrance Road / Looking South / Southeast (July 16, 2014)
Security Fence Installation, Southern OU-1 Boundary / Looking West (July 18, 2014)
Gypsum Wall Buttress Building / Looking West (May 2, 2014)
Security Fence Placement / Looking East (May 2, 2014)
Security Fence Material / Looking North (May 6, 2014)
OU1 Property Boundary Flagging / Looking East (May 6, 2014)
OU1 Property Boundary Line Observations / Looking East (May 6, 2014)
Security Fence Installation, Southern OU-1 Boundary / Looking West (July 18, 2014)
Site Clearing, Tire Disposal / Looking East (July 18, 2014)
Trucking Imported Fill Cover Materials , Site Entrance / Looking North (July 22, 2014)
Imported Clean Fill Cover Materials on Haul Road / Looking West (July 22, 2014)
Security Fence, Southern OU-1 Site Boundary / Looking East (July 29, 2014)
Widening Turn on Clean Cover Haul Road Entrance / Looking North / Northwest (August 19, 2014)
Clean Soil Cover Haul Road Near OU-1 Entrance / Looking West (September 2, 2014)
Widening Turn on Clean Cover Haul Road Entrance / Looking North (August 19, 2014)
Cleaning the Clean Cover Haul Road Following a Rain Event / Looking West (August 19, 2014)
Clean Soil Cover Haul Trucks Entering OU-1 / Looking South (August 26, 2014)
Water Truck Wetting Down Clean Soil Cover Haul Road / Looking East (August 26, 2014)
Haul Road Truck Signage / Looking Southeast (August 26, 2014)
Clean Soil Cover Haul Road Near OU-1 Entrance / Looking East / Northeast (September 2, 2014)
Clean Soil Cover Haul Road Near OU-1 Entrance / Looking North (September 2, 2014)
Grass Seeding Along Southern RDA Buttress Slopes / Looking North (September 19, 2014)
Straw Cover of New Grass Seed on Southern RDA Buttress Slopes / Looking West (September 20, 2014)
Site Entrance Mirror, off of Missouri Ave. / Looking North (September 23, 2014)
Clean Cover Soil Trucks Entering the Site / Looking North (September 26, 2014)
Straw Covering Slopes of Western RDA / Looking West (September 26, 2014)
Newly Seeded Slopes Near Site Entrance / Looking North (October 14, 2014)
Newly Seeded Slopes Near Site Entrance / Looking East (October 14, 2014)
Grass Emergence On Slopes of Southern RDA / Looking West (October 21, 2014)
Proposed Location For 100-Year Emergency Drainage A&S Railroad Gabion Basket Structure / Looking West (October 29, 2014)
Southern RDA Storm Water Retention Pond / Looking Northwest (October 29, 2014)
Site Tour with USEPA Project Manager / Looking West (October 29, 2014)
Used Tires Being Transported Off-Site / Looking South (November 20, 2014)
Slope of Southern RDA / Looking West (November 20, 2014)
Warning Signs Installed Near OU-1 Entrance / Looking North (November 26, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #1 / Looking North / Northwest (December 11, 2014)
Near Entrance to Haul Road Onto OU-1 / Looking West (October 30, 2014)
Slopes of Southern RDA Near Haul Road Entrance / Looking North (November 18, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #1 / Looking West (December 11, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #1 / Looking West (December 11, 2014)
Cover Soil Thickness Verification and Pre-Final Inspection, Area 1B Test Hole #1 / Looking West (December 11, 2014)
Air Monitoring Equipment, Area 1B Near OU-1 Haul Road Entrance / Looking North / Northeast (April 27, 2015)
Air Monitoring Equipment, Area 1B Near OU-1 Haul Road Entrance / Looking North / Northeast (April 27, 2015)
Area 1B Slope Near Soil Truck Entrance / Looking West (May 21, 2015)
Cover Soil Grass Emergence, Area 1B / Looking Northeast (May 21, 2015)
Area 1B Slope Near Soil Truck Entrance / Looking West (May 21, 2015)
OU-1 Site Haul Road / Looking East (July 2, 2015)
Installation of Area 1B Gabion Basket Overflow Structure / Looking Northeast (September 10, 2015)
Area 1B Slopes / Looking East / Northeast (September 29, 2015)
Area 3B Gypsum Berm / Looking West (October 23, 2015)
Vegetation Removal and Chipping, OU-1 Southeast Corner / Looking Northeast (October 28, 2015)
OU-2 Excavation, Paule and Lewis Properties / Looking East / Southeast (November 3, 2015)
Gypsum Berm Area in OU-1 / Looking East (November 3, 2015)
Area 1B Storm Water Overflow Structure / Looking South (September 29, 2016)
Gypsum Berm Area in OU-1 / Looking East / Southeast (November 12, 2015)
Pre-Final Inspection Meeting and Site Walk-through / Looking North (November 18, 2015)
Pre-Final Inspection Meeting and Site Walk-through / Looking South (November 18, 2015)
Excavation of OU-1 Gypsum / Looking South (November 19, 2015)
Gypsum Removal in OU-1 / Looking Northwest (November 20, 2015)
Gypsum Excavation Area in OU-1 / Looking Northeast (November 24, 2015)
OU-1 Gypsum Berm Area / Looking Northwest (December 2, 2015)
Area 1A Current Conditions / Looking East / Northeast (September 21, 2016)
Area 1A Current Conditions / Looking South (September 21, 2016)
OU-1 Gypsum Berm Area / Looking West / Northwest (December 2, 2015)
Application of Clean Soil Cover in OU-1 Gypsum Berm Area / Looking North / Northwest (December 10, 2015)
Application of Clean Soil Cover in OU-1 Gypsum Berm Area / Looking East (December 10, 2015)
Application of Clean Soil Cover in OU-1 Gypsum Berm Area / Looking North / Northwest (December 10, 2015)
Application of Clean Soil Cover in OU-1 Gypsum Berm Area / Looking North / Northwest (December 11, 2015)
Area 1A Current Conditions / Looking West / Southwest (September 21, 2016)
Area 1A Current Conditions / Looking Northeast (September 21, 2016)